Project Duration
Stipulated Date of Commencement
January 19 2014
Stipulated Date of Completion /
Likely Date of Completion July 18 2015
Likely Date of Completion July 18 2015
Status
100%
Completed
Cost (₹)
Estimated at
₹ 334,479,486.00
Awarded for
₹ 277,200,000.00
Project highlights
The project consists of two lane composite steel girder bridge of 220 m length along with approaches of 1600 m on Amona side and 500 m on Virdi side. The bridge lighting is of signature high quality LED fittings.
Contractors
M/s. M. Venkata Rao Infra Projects Pvt. Ltd.
Consultants
M/s. Madhav Kamat & Associates
Sub Works
This project involved 1 sub works. The details of the same available below
1
Design and construction of Bridge across River Zuari between Amona and Virdi. SH: Supply of LED Fittings, Poles and Brackets
100% completed
Project Duration
Stipulated Date of Commencement
February 26 2018
Stipulated Date of Completion /
Likely Date of Completion April 26 2018
Likely Date of Completion April 26 2018
Status
100%
Completed
Cost (₹)
Estimated at
₹ 2,399,120.00
Awarded for
₹ 2,820,440.00
Contractors
M/s. M. Venkata Rao Infra Projects Pvt. Ltd.
Consultants
M/s. Madhav Kamat & Associates
See Similar Projects
Rawanfond Bridge
View Project
Comprehensive electrical underground cabling work at Bambolim.
View Project
Dismantling of HT overhead lines and supplying & laying of HT Underground cables at Porvorim
View Project