Project Duration
Stipulated Date of Commencement
December 11 2018
Actual Date of Completion
April 30 2022
Status
100%
Completed
Cost (₹)
Estimated at
₹ 233,805,559.34
Awarded for
₹ 249,915,774.13
Project highlights
1.To develop and beautify both sides of the existing road at Khareabandh area.
2.Construction of Footpath from the front of theSt. Micheal Church towards the main MDR road at Orlim.
3.Construction of retaining wall with illumination and beautification of road with the Foot Path along the road at Varca, Benaulim, Seraulim & Cavelossim.
Contractors
M/s.Souza Engineers Contractors Pvt. Ltd.
Consultants
M/s. Construma Consultancy Pvt. Ltd.