Project Duration
Stipulated Date of Commencement December 26 2013
Actual Date of Completion May 31 2016
Status
100%
Completed
Cost (₹)
Estimated at ₹ 85,018,148.00
Awarded for ₹ 91,139,460.92
Final Cost of Project ₹ 50,696,660.00

Project highlights

Based on the requirements, a new Concrete road is developed connecting NH 17 to School complex. The ROW of rigid pavement road is 17m with carriageway width of 14 m (four lane divided carriageway) and foot path width of 3m (2m on LHS and 1m on RHS). Other provisions include 600mm NP2 RCC pipe on either side for Storm Water Drains, concrete ducts on LHS for carrying various electrical cables. The total length of road is 500m with provision of roundabout at the end.
The road is provided with 22 numbers of decorative street light poles with LED fixtures.
Hence, development of this road will facilitate the students attending various schools in the complex and will provide an access to a newly built athletic stadium.

 
Contractors
M/s. Sudhir Constructions
Consultants
M/s. Kashec Engineers Pvt. Ltd.
 

See Similar Projects

Bridge connecting Veluz and Dhabos in Valpoi including approaches.

View Project

Bridge Across St. Inez Creek on 18th June Road, Panaji

View Project

Repairs and Upgradation of roads and storm water drains around new Library Building, GMC Complex, Bambolim, Goa.

View Project
x