Likely Date of Completion February 25 2014
Project highlights
Based on the requirements, a new Concrete road is developed connecting NH 17 to School complex. The ROW of rigid pavement road is 17m with carriageway width of 14 m (four lane divided carriageway) and foot path width of 3m (2m on LHS and 1m on RHS). Other provisions include 600mm NP2 RCC pipe on either side for Storm Water Drains, concrete ducts on LHS for carrying various electrical cables. The total length of road is 500m with provision of roundabout at the end.
The road is provided with 22 numbers of decorative street light poles with LED fixtures.
Hence, development of this road will facilitate the students attending various schools in the complex and will provide an access to a newly built athletic stadium.
Contractors
Consultants
See Similar Projects
HVAC work.
View Project
Construction of Concrete Pavement Road and other development work from Miramar Circle to NIO Circle and Raj Bhavan
View Project
Construction of bridge over river Zuari at St. Jacinto Island in Village Panchayat of Chicalim
View Project