Project Duration
Stipulated Date of Commencement
May 22 2003
Stipulated Date of Completion /
Likely Date of Completion November 21 2004
Likely Date of Completion November 21 2004
Status
100%
Completed
Cost (₹)
Estimated at
₹ 91,123,000.00
Awarded for
₹ 87,900,000.00
Project highlights
• Length : 150 m, width : 12 m.
• Length of clear navigational span : 65 m.
• Carriage way width: 7.5 m.
• Width of footpaths with paver block : 1.50 m.
• Length of approach on Pirna side : 200 m and on Ozorim side : 450 m.
• Electric poles with fixtures on the bridge and approaches.
• The bridge serves as a connection to the Ozorim and Pirna village.
• The bridge has reduced the distance from Pirna to Pernem by 15 kms
Contractors
M/s. M. Venkata Rao Infra Projects Pvt. Ltd.
Consultants
M/s. TPF Engineering Pvt. Ltd.
See Similar Projects
Development of infrastructure for Panaji Minor Port : Construction of Jetty at Brittona.
View Project
Construction of Bridge across Baga creek at Baga including approaches.
View Project
Improvement and Upgradation of existing road from Miramar Circle to Dona Paula Jetty – Balance work from Miramar Circle to NIO Circle – Phase I.
View Project





