Project Duration
Stipulated Date of Commencement January 15 2022
Stipulated Date of Completion /
Likely Date of Completion
August 15 2024
Status
95%
Completed
Cost (₹)
Estimated at ₹ 333,023,654.55
Awarded for ₹ 336,806,755.00

Project highlights

The main objective of the project is to protect the costline and to restore the river bank and to open the city to river bank by developing a promenade with walkway, cycling track along the Mandovi River that will allow people to properly enjoy the beauty and connect all the previously said city amenities.
• A continuous protection wall along the coast with granite bolders protecting the coastline from erosion.
• The promenade walk way of 4.5 mtrs wide is provided with granite paver flooring along with parapet wall river side & seat outs on other side with granite cladding & 50mm thick slab over the top portion.
• Concrete cycle track of 2.8 mtrs wide is provided with side drains & electrification.
• The promenade will be continuous and will be connected to the existing roads.
• Place making providing identity to every spot along the footpath, creating easy recognizable locations. Natural islands for eating areas, selfie points, seating area along with playgrounds, skating and leisure spots will be provided.
• Street light poles and decorative illumination will be provided.
• Ramps & steps will be provided for access to the beach and existing fishing boats near Childrens park.
• The promenade will be connected to the Miramar Beach to Mahaveer Garden & DB road near ESG.
• There will be a continuous protection wall along the coast. Wherever the existing one has collapsed, it has been rebuilt, and missing walls have been built.

 
Gallery Image
Contractors
M/s. DHIPL Projects Pvt. Ltd.
Gallery Image
Consultants
M/s. LKS India Pvt. Ltd.,
 
Similar Projects

See Similar Projects

Similar Project

Redesigning and reconstruction of existing buildings and additional construction and new administration and training block for Fire station at Panaji,Goa.

View Project
Similar Project

Repairs/ Maintenance of Government Hospitals/ Health Centres under Directorate of Health Services SH : Elevator maintenance at Primary Health Centre, Bicholim for five years

View Project
Similar Project

Development plan of site of Shree Mahalasa Devi Temple at Verna – Phase III – Balance of Rain water harvesting tank and allied works

View Project
x
  • 150yrs of Celebrating Mahatma Gandhi
  • Digital India
  • Government Of Goa
  • Incredible India
  • NationalPortal India gov
Disclaimer: Translated by Directorate of Official Language, Government of Goa. Note: In any case for legal interpretation, English version will prevail.