Likely Date of Completion August 20 2015
Project highlights
• Multipurpose Playground of approximately 5600 m2 area with doob grass.
• Paved jogging track of length approximately 310 m and 3.0 m width, illuminated by LED lighting
• Drainage system to drain out rain water
• Plantation of trees and shrubs
• Volleyball court (Clay base)
• Toilet block and office room
• 2 nos of underground tank of 13000 liters capacity each
• Paved Parking space and footpath
• Compound wall with one no of 4m wide gate and 2 nos of 2m wide gates on other side.