Project Duration
Stipulated Date of Commencement January 14 2016
Stipulated Date of Completion /
Likely Date of Completion
August 13 2016
Status
100%
Completed
Cost (₹)
Estimated at ₹ 44,883,534.00
Awarded for ₹ 54,586,026.00

Project highlights

1. The Bridge was used to facilitate the Defence Expo 2016.
2. Length of the bridge and no. of spans: Single span of 24.75 mt long
3. Loading: One lane of Class 70R wheeled/ tracked or 2 lanes of Class ‘A’ which is critical.
4. Type & Depth of Foundations: Pile Foundation – On Fatorpa Side 30.2 m & on Balli Side 26.19 m
5. Sub-Structure: RCC
6. Bearing: POT PTFE
7. Superstructure: Composite steel plate girder, RCC deck slab.
8. Carriageway and footpath widths: 7.5 mts. Carriageway & 1.5 m footpath on each side.
9. Details of wearing coat: 50 mm D.B.M. with 25mm Polymerized Modified Bitumen, 3mm waterproofing membrane
10. Details of Expansion Joints: Strip seal expansion joints.

 
Gallery Image
Contractors
M/s. M. Venkata Rao Infra Projects Pvt. Ltd.
Gallery Image
Consultants
M/s. Vijaykumar Sawant Associates
 
Similar Projects

See Similar Projects

Similar Project

Acoustic work for Multipurpose Hall.

View Project
Similar Project

Improvement and Upgradation of road network at Piligao, Curti, Ponda Town and Chodan.

View Project
Similar Project

Construction of Pedestrian Arch Bridge connecting Mandovi River Promenade and DB Road, over St. Inez Creek near ESG Building at Panaji

View Project
x
  • 150yrs of Celebrating Mahatma Gandhi
  • Digital India
  • Government Of Goa
  • Incredible India
  • NationalPortal India gov
Disclaimer: Translated by Directorate of Official Language, Government of Goa. Note: In any case for legal interpretation, English version will prevail.