Project Duration
Stipulated Date of Commencement
March 18 2019
Stipulated Date of Completion /
Likely Date of Completion January 15 2023
Likely Date of Completion January 15 2023
Status
100%
Completed
Cost (₹)
Estimated at
₹ 19,396,779.97
Awarded for
₹ 19,994,471.03
Project highlights
The details of project are as follows:
• Name of the Client : Directorate of Panchayat.
• Executing Agency : GSIDC
• Name of the Consultant : M/s. Bhaskar Wagle
• Total plot area : 5100.00 Sq.M.
• Total Built-Up area : 781.66 Sq. M.
• The estimated cost of the work : Rs.1,93,96,779.97.
Design Concept
• The building is a Ground plus 2 RCC structure.
• The building shall include 6 Shops on ground floor, cabin for Sarpanch, Secretary, Talathi, meeting room, Panchayat office, Library on first floor and Multipurpose hall on second floor.
• The building shall have adequate parking facilities for four and two wheelers.
• A barrier free environment has been provided through an access ramp at the ground level and an elevator for upper levels.
Contractors
M/s. Mahabaleshwar M. Naik & Co.
Consultants
M/s. Bhaskar Wagle & Associates