Project Duration
Stipulated Date of Commencement February 22 2014
Stipulated Date of Completion /
Likely Date of Completion
February 21 2015
Status
100%
Completed
Cost (₹)
Estimated at ₹ 334,900,000.00
Awarded for ₹ 417,969,000.00

Project highlights

The Grade Separator consists of two U-shaped Flyovers one towards Verna and the other towards Vasco side of the Goa International Airport at Dabolim. This was the need of the hour considering the massive traffic movement from all sides of Goa, on the roads leading to Dabolim airport, especially during peak hours of the flight movement, eventually resulting into traffic congestion near the airport. These two newly constructed flyovers along with the slip roads facilitate smooth traffic movement towards and away from the airport and also avoids traffic congestion near the airport. Total length of the flyover towards Verna is 686.74 m, including two approach roads from two ends of this flyover. Total length of the flyover towards Vasco is 579.34 m, including two approach roads from two ends of this flyover. In addition to the two flyovers, two slip roads of 7.5m carriageway width has been constructed towards Verna and one slip road of 7.5m carriageway width has been constructed towards Vasco which will carry dedicated traffic in and out of the+G1414 airport

 
Gallery Image
Contractors
M/s. M. Venkata Rao Infra Projects Pvt. Ltd.
Gallery Image
Consultants
M/s. TPF Engineering Pvt. Ltd.
 

Sub Works

This project involved 2 sub works. The details of the same available below

1

Supply of Poles And Light Fixtures

100% completed
 
Project Duration
Stipulated Date of Commencement December 24 2018
Stipulated Date of Completion /
Likely Date of Completion
February 22 2019
Status
100%
Completed
Cost (₹)
Estimated at ₹ 7,220,988.00
Awarded for ₹ 5,785,120.00

Project highlights

The project consists of supply of 8 meter single arm poles & 110-120W and LED Fixtures for the bridge..

 
Contractors
Contractors
M/s. L.L.Electricals
Consultants
Consultants
In-house (GSIDC)
2

Providing and applying high build, crack building, electromeric, protective and waterproof coating to the Grade separator (2 flyovers) at Dabolim airport.

100% completed
 
Project Duration
Stipulated Date of Commencement March 31 2023
Stipulated Date of Completion /
Likely Date of Completion
April 30 2023
Status
100%
Completed
Cost (₹)
Estimated at ₹ 12,495,124.80
Awarded for ₹ 9,944,036.82

Project highlights

The project consisted painting of Grade Seperator (02 Flyovers) on account of G20 Summit held in Goa in 2023.

 
Contractors
Contractors
M/s. Perfect Engineers and contractors
Consultants
Consultants
In-house (GSIDC)
Similar Projects

See Similar Projects

Similar Project

Improvement and Upgradation of the existing MDR from Dandevaddo to Chandor via Sarzora and Guddi in Cuncolim Constituency.

View Project
Similar Project

Construction of Bus Stand at Marcel, Goa – Civil, Plumbing, Acoustic, Electrical, HVAC and Fire Fighting work.

View Project
Similar Project

Construction of footpath from Sai Service Junction to Training College Junction at Porvorim.

View Project
x
  • 150yrs of Celebrating Mahatma Gandhi
  • Digital India
  • Government Of Goa
  • Incredible India
  • NationalPortal India gov
Disclaimer: Translated by Directorate of Official Language, Government of Goa. Note: In any case for legal interpretation, English version will prevail.