Likely Date of Completion August 13 2016
Project highlights
1. The Bridge was used to facilitate the Defence Expo 2016.
2. Length of the bridge and no. of spans: Single span of 24.75 mt long
3. Loading: One lane of Class 70R wheeled/ tracked or 2 lanes of Class ‘A’ which is critical.
4. Type & Depth of Foundations: Pile Foundation – On Fatorpa Side 30.2 m & on Balli Side 26.19 m
5. Sub-Structure: RCC
6. Bearing: POT PTFE
7. Superstructure: Composite steel plate girder, RCC deck slab.
8. Carriageway and footpath widths: 7.5 mts. Carriageway & 1.5 m footpath on each side.
9. Details of wearing coat: 50 mm D.B.M. with 25mm Polymerized Modified Bitumen, 3mm waterproofing membrane
10. Details of Expansion Joints: Strip seal expansion joints.
Contractors
Consultants
See Similar Projects
Supply, Installation, Testing and Commissioning of flag mast system at the new bridge across river Mandovi at Panaji, Goa. SH: Supply of 20ftX30 ft National Flag
View Project
Demolition & Salvaging of existing jetty at Kala Academy.
View Project
Supply, Installation, Testing and Commissioning of flag mast system at the new bridge across river Mandovi at Panaji, Goa
View Project