Project Duration
Stipulated Date of Commencement
May 22 2003
Stipulated Date of Completion /
Likely Date of Completion November 21 2004
Likely Date of Completion November 21 2004
Status
100%
Completed
Cost (₹)
Estimated at
₹ 91,123,000.00
Awarded for
₹ 87,900,000.00
Project highlights
• Length : 150 m, width : 12 m.
• Length of clear navigational span : 65 m.
• Carriage way width: 7.5 m.
• Width of footpaths with paver block : 1.50 m.
• Length of approach on Pirna side : 200 m and on Ozorim side : 450 m.
• Electric poles with fixtures on the bridge and approaches.
• The bridge serves as a connection to the Ozorim and Pirna village.
• The bridge has reduced the distance from Pirna to Pernem by 15 kms
Contractors
M/s. M. Venkata Rao Infra Projects Pvt. Ltd.
Consultants
M/s. TPF Engineering Pvt. Ltd.
See Similar Projects
Design and Construction of Bridge at Ambeshi – Ganjem over Mhadei river.
View Project
Hot mixing of road from O’ Coqueiro to Calangute beach via St Anthony Chapel and from St. Anthony Chapel to Fort Aguada in Bardez Taluka.
View Project
Construction of bridge over river Zuari at St. Jacinto Island in Village Panchayat of Chicalim
View Project