Project Duration
Stipulated Date of Commencement September 30 2014
Actual Date of Completion April 15 2017
Status
100%
Completed
Cost (₹)
Estimated at ₹ 42,471,760.00
Awarded for ₹ 46,571,798.00
Final Cost of Project ₹ 62,149,142.00

Project highlights

• The building has been provided with easy to maintain, clean and hygienic infrastructure.
• Clear segregation of various age groups.
• Total strengthening of existing structure and existing RCC scattered roofs covered with large single fourway galvalume sheet roofing, having large overhangs. The large roof helps protect the building against Rains and harsh sunlight.
• The walls are clad internally with vitrified tiles. These help in easy maintenance and to prevent any vandalisation of wall surfaces. The tile cladding also helps to strengthen the week walls.
• Playful and colourful interiors.
• All dormitories provided with attached toilets.
• Separate kitchen and dining facilities for Girls.
• CCTV surveillance of common areas and speaker systems installed throughout the building for Music.
• Easy access to the secured, outdoors and garden for inmates.
• Ample natural light and ventilation.
• Windows provided with toughened glass. Doors are designed to be porous to keep easy watch on the inmates.

 
Contractors
M/s S M Realtors
Consultants
M/s Bhaskar Wagle Associates
 

See Similar Projects

Strengthening of existing food & drugs laboratory under Directorate of Food & Drugs Administration Block at Bambolim Complex, Bambolim Tiswadi – Goa SH: Upgradation of the Microbiological section.

View Project

Upgradation of facilities of Pilgrims for Exposition 2014 at Old Goa

View Project

Signages work

View Project
x