Project Duration
Stipulated Date of Commencement November 26 2016
Actual Date of Completion July 10 2017
Status
100%
Completed
Cost (₹)
Estimated at ₹ 9,780,236.00
Awarded for ₹ 10,172,228.00
Final Cost of Project ₹ 9,699,122.00

Project highlights

• Walking track/Pathway- The Park has a 230 m long pathway as walking track finished with Polygon Beauty paver block.
• Stage- It is provided with a stage of area 27.40 Sq.m, finished with Kota stone flooring and covered with colour coated galvulium roofing sheets.
• Pergola- It is provided with pergola finished with colour concrete flooring.
• Badminton Court- The flooring of the existing badminton court is finished with colour concrete and Flag Stone Paver block for surrounding area.
• Play Area- the Park is equipped with 1 set of multipurpose play system, G.I Arch Double Swing and 1set Kid’s Multiple Set play system. All the play system are installed on EPDM rubber flooring and inter connected with pathway finished with Grass Paver block.
• Landscape- It is covered with Crab Grass and planted with different types of plants such as Golden Duranta, Canna Pink1? high, Almanda yellow, Wedelia Tilobata and Palms like Coconut Palm, Champion Palm, Areca Palm.
• Electrical- It is well lighted with Decorative Luminaries mounted on decorative bracket on 4 m height G.I poles and decorative integral bollards

 
Contractors
M/s Deepak V Marathe
Consultants
M/s Nitin Arolkar
 

See Similar Projects

UPGRADATION OF PRIMARY HEALTH CENTRE AT SHIRODA, GOA- AIR CONDITIONING WORKS

View Project

Maintenance works at Goa Medical College and Hospital, including Hospitals and Health Centres under the jurisdiction of Goa Medical College S.H.:Supply, Installation, Testing and Commissioning of Audio Power Amplifiers for Lecture Halls 4, 5 & 6 at Goa Medical College

View Project

supply and erection of new 11KV line with AB conductor from 33/11KV colony substation to M/s Rajiv Gandhi Kala Mandir

View Project
x