Project Duration
Stipulated Date of Commencement June 21 2008
Actual Date of Completion April 20 2012
Status
100%
Completed
Cost (₹)
Estimated at ₹ 50,491,341.00
Awarded for ₹ 68,881,108.50
Final Cost of Project ₹ 7,16,46,967.00

Project highlights

The primary health centre is situated at the prime location and caters population of Sanquelim and neighboring areas. It is situated near the old Primary Health Centre, at the junction of Bicholim to Valpoi road and Amona to Sanquelim road and about 1 Km away from the Sanquelim Market / Kadamba Bus Stand. The building is designed in “Y” shape by which it provides adequate light and ventilation to the entire area of hospital. All the three wings connecting to the central location serves as full functional area keeping the entire hospital services nearby and centrally located corridors to facilitate functional working of the hospital. The said building is 70 bedded hospital with RCC framed structure having partly second floor with sloping roof slab over one full first floor and over a ground floor without any basement.
The ground floor consists of N.G.O., immunization, pediatric physiotherapy councilor’s stimulation, pediatric clinic, play area, breast feeding, waiting area, obsterics & gyn, behavioral science, store room, gents and ladies toilet, M.S. room, medical store, surgical examination, pharmacy, treatment room, medical exam, herb room, sterile store, autoclave, ayurved / homeopathy, canteen, kitchen, utilities / maintenance, laundry, housekeeping, dental, opth/ENT, Administration, sample collection, laboratory, ortho, physiotheraphy, X-Ray, Ultra sound, trauma OT, Doctor’s room, trauma ward, etc.
The first floor consists of male ward, female ward, medical ICU, treatment room, gents and ladies toilet, Doctor’s room, neo-natal ICU, dialysis / Urology, two operation theatres, recovery room, sterile store, doctor’s / nurses’ changing room, delivery room, labour room, sluice, scrub, etc.
The second floor consists of seminar room, nurses’ rest room, doctor’s rest room, study room, bed room / living area, kitchen with attached toilet for DNB students (2 Nos.), 2 Nos. paid ward.
Other structures such as guard house, substation, mortuary, gas manifold, etc. are provided within the hospital campus.

 
Contractors
M/s. M. Venkata Rao Infra Projects Pvt. Ltd.
Consultants
M/s. Consulting Engineering Services Pvt. Ltd.
 

Sub Works

This project involved 13 sub works. The details of the same available below

1

External Electrical works

100% completed
 
Project Duration
Stipulated Date of Commencement February 14 2010
Stipulated Date of Completion /
Likely Date of Completion
April 02 2012
Status
100%
Completed
Cost (₹)
Estimated at ₹ 4,320,955.00
Awarded for ₹ 40,38,353.50
 
Contractors
M/s. Sunshine Electricals & Co. Pvt. Ltd.
Consultants
M/s. Consulting Engineering Services Pvt. Ltd.
2

Air conditioning works

100% completed
 
Project Duration
Stipulated Date of Commencement February 19 2010
Stipulated Date of Completion /
Likely Date of Completion
April 02 2012
Status
100%
Completed
Cost (₹)
Estimated at ₹ 8,344,768.00
Awarded for ₹ 76,61,699.00
 
Contractors
M/s. Speedfrost Services
Consultants
M/s. Consulting Engineering Services Pvt. Ltd.
3

Lift work

100% completed
 
Project Duration
Stipulated Date of Commencement February 16 2010
Stipulated Date of Completion /
Likely Date of Completion
March 02 2012
Status
100%
Completed
Cost (₹)
Estimated at ₹ 1,960,000.00
Awarded for ₹ 20,00,000.00
 
Contractors
M/s. Thyssenkrupp Elevators (P) Ltd.
Consultants
M/s. Consulting Engineering Services Pvt. Ltd.
4

Steel Operation Theatre work.

100% completed
 
Project Duration
Stipulated Date of Commencement December 25 2010
Stipulated Date of Completion /
Likely Date of Completion
March 30 2012
Status
100%
Completed
Cost (₹)
Estimated at ₹ 1,26,16,252.00
Awarded for ₹ 1,29,52,000.00
 
Contractors
M/s. Mediconz International
Consultants
M/s. Consulting Engineering Services Pvt. Ltd.
5

Medical gas and Vacuum System work

100% completed
 
Project Duration
Stipulated Date of Commencement January 20 2011
Stipulated Date of Completion /
Likely Date of Completion
March 20 2012
Status
100%
Completed
Cost (₹)
Estimated at ₹ 40,22,007.00
Awarded for ₹ 38,60,325.00
 
Contractors
M/s. Hitech Engineering Works
Consultants
M/s. Consulting Engineering Services Pvt. Ltd.
6

Interior and Furniture works

100% completed
 
Project Duration
Stipulated Date of Commencement October 02 2011
Stipulated Date of Completion /
Likely Date of Completion
April 20 2012
Status
100%
Completed
Cost (₹)
Estimated at ₹ 7,010,827.44
Awarded for ₹ 6,303,000.00
 
Contractors
M/s. Deshpande Constructions
Consultants
M/s. Consulting Engineering Services Pvt. Ltd.
7

Mortuary cabinet work

100% completed
 
Project Duration
Stipulated Date of Commencement October 21 2011
Stipulated Date of Completion /
Likely Date of Completion
December 20 2011
Status
100%
Completed
Cost (₹)
Estimated at ₹ 410,414.00
Awarded for ₹ 482,000.00
 
Contractors
M/s. MegaStar Engineering
Consultants
M/s. Consulting Engineering Services Pvt. Ltd.
8

Internal Electrical works

100% completed
 
Project Duration
Stipulated Date of Commencement June 26 2009
Stipulated Date of Completion /
Likely Date of Completion
March 31 2012
Status
100%
Completed
Cost (₹)
Estimated at ₹ 50,52,760.00
Awarded for ₹ 5,122,999.00
 
Contractors
M/s. Mohan Electricals
Consultants
M/s. Consulting Engineering Services Pvt. Ltd.
9

Fire fighting, fire alarm and PA System works

100% completed
 
Project Duration
Stipulated Date of Commencement November 03 2010
Stipulated Date of Completion /
Likely Date of Completion
January 24 2013
Status
100%
Completed
Cost (₹)
Estimated at ₹ 6,450,378.00
Awarded for ₹ 7,290,025.00
 
Contractors
M/s. Japsin Jacob Wire Drawing Pvt. Ltd.
Consultants
M/s. Consulting Engineering Services Pvt. Ltd.
10

Interiors (Loose Furniture Works)

100% completed
 
Project Duration
Stipulated Date of Completion /
Likely Date of Completion
August 20 2012
Status
100%
Completed
Cost (₹)
Estimated at ₹ 49,69,922.00
Awarded for ₹ 5,084,300.00
 
Contractors
M/s. Concept Creator
Consultants
M/s. Consulting Engineering Services Pvt. Ltd.
11

Interiors (Loose Furniture Works)

100% completed
 
Project Duration
Stipulated Date of Commencement March 24 2012
Stipulated Date of Completion /
Likely Date of Completion
August 20 2012
Status
100%
Completed
Cost (₹)
Estimated at ₹ 49,69,922.00
Awarded for ₹ 5,084,300.00
 
Contractors
M/s. Concept Creator
Consultants
M/s. Consulting Engineering Services Pvt. Ltd.
12

Landscaping works

100% completed
 
Project Duration
Stipulated Date of Commencement July 01 2012
Stipulated Date of Completion /
Likely Date of Completion
August 14 2012
Status
100%
Completed
Cost (₹)
Estimated at ₹ 52,96,229.00
Awarded for ₹ 5,478,010.00
 
Contractors
M/s. Indage Development Construction Pvt. Ltd.
Consultants
M/s. Consulting Engineering Services Pvt. Ltd.
13

Compound wall work.

100% completed
 
Project Duration
Stipulated Date of Commencement December 14 2012
Stipulated Date of Completion /
Likely Date of Completion
January 20 2014
Status
100%
Completed
Cost (₹)
Estimated at ₹ 823,021.00
Awarded for ₹ 926,207.80
 
Contractors
M/s. Sandeep R. S. Khandeparkar
Consultants
Inhouse

See Similar Projects

sewage treatment plant at 30 KLD capacity

View Project

Supply, Installation, Testing and Commissioning of E. T. O Machine

View Project

Supplying and laying of 33 KV underground cable from Sub Station to District Hospital at Mapusa

View Project
x