Project Duration
Stipulated Date of Commencement December 21 2014
Actual Date of Completion November 30 2016
Status
100%
Completed
Cost (₹)
Estimated at ₹ 12,526,608.00
Awarded for ₹ 13,721,642.06
Final Cost of Project ₹ 15,030,467.00

Project highlights

• Multipurpose Playground of approximately 5600 m2 area with doob grass.
• Paved jogging track of length approximately 310 m and 3.0 m width, illuminated by LED lighting
• Drainage system to drain out rain water
• Plantation of trees and shrubs
• Volleyball court (Clay base)
• Toilet block and office room
• 2 nos of underground tank of 13000 liters capacity each
• Paved Parking space and footpath
• Compound wall with one no of 4m wide gate and 2 nos of 2m wide gates on other side.

 
Contractors
M/s. Prasad Enterprises
Consultants
M/s. TPF Engineering Pvt. Ltd.
 

See Similar Projects

Infrastructure Works for Sanjay Centre for Special Education at Porvorim & Vasco- Interior Works

View Project

“Extension of R.M.O Hostel at Goa Medical College and Hospital, Bambolim, Goa S.H.: Supply, Installation, Testing and Commissioning of 11KV 4 Way outdoor type RMU and other allied works”

View Project

Construction of swimming pool at Ponda Sports Complex – Additional works such as Jogging Track, Road, Compound wall, Security Cabin etc.

View Project
x