Project Duration
Stipulated Date of Commencement
September 17 2015
Stipulated Date of Completion /
Likely Date of Completion March 16 2017
Likely Date of Completion March 16 2017
Status
100%
Completed
Cost (₹)
Estimated at
₹ 164,370,587.00
Awarded for
₹ 167,497,585.14
Project highlights
The Existing Resident Medical Officers Hostel is proposed to be extended with a connecting corridor at first floor level, the extension building has 80 single occupancy rooms and 24 double occupancy rooms, canteen and library rooms etc.
Contractors
M/s. Shreejikrupa Buildcon Ltd
Consultants
M/s. Frischmann Prabhu (I) Pvt. Ltd
Sub Works
This project involved 3 sub works. The details of the same available below
1
Extension of R.M.O Hostel at Goa Medical College and Hospital, Bambolim, Goa S.H.: Supply, Installation, Testing and Commissioning of 11KV 4 Way outdoor type RMU and other allied works
100% completed
Project Duration
Stipulated Date of Commencement
September 14 2018
Stipulated Date of Completion /
Likely Date of Completion November 13 2018
Likely Date of Completion November 13 2018
Status
100%
Completed
Cost (₹)
Estimated at
₹ 775,410.00
Awarded for
₹ 719,999.00
Project highlights
SITC of 11KV 4 Way outdoor type RMU and other allied works at R.M.O Hostel at Goa Medical College.
Contractors
M/s. Volton Engineering (I) Pvt. Ltd.,
Consultants
M/s. Frishmann Prabhu (I) Pvt. Ltd.
2
Extension of R.M.Os Hostel at Goa Medical College and Hospital, Bambolim, Goa – Sewage Treatment Plant
100% completed
Project Duration
Stipulated Date of Commencement
August 01 2019
Stipulated Date of Completion /
Likely Date of Completion August 10 2019
Likely Date of Completion August 10 2019
Status
100%
Completed
Cost (₹)
Estimated at
₹ 10,528,091.00
Awarded for
₹ 12,883,641.47
Project highlights
Sewage treatment plant
Contractors
M/s. Raveena Watertech,
Consultants
M/s. Frischmann Prabhu (I) Pvt. Ltd.
3
Extension of R.M.O Hostel at Goa Medical College and Hospital, Bambolim, Goa S.H.: Interior, Furniture works
100% completed
Project Duration
Stipulated Date of Commencement
November 09 2018
Stipulated Date of Completion /
Likely Date of Completion March 08 2019
Likely Date of Completion March 08 2019
Status
100%
Completed
Cost (₹)
Estimated at
₹ 22,119,472.00
Awarded for
₹ 17,220,494.00
Project highlights
Providing furniture and interior works at RMO Hostel at GMC.
Contractors
M/s.Virender Kumar & Co.
Consultants
M/s. Frishmann Prabhu (I) Pvt. Ltd.
See Similar Projects
SH- Premonsoon works
View Project
Construction of New Hospital Block in place of existing Hospital for Institute of Psychiatry & Human Behaviour, Goa : Substation and allied works – Civil
View Project
Supply and Installation of Office Furniture
View Project