Project Duration
Stipulated Date of Commencement
May 01 2008
Stipulated Date of Completion /
Likely Date of Completion January 31 2009
Likely Date of Completion January 31 2009
Status
100%
Completed
Cost (₹)
Estimated at
₹ 25,895,502.00
Awarded for
₹ 38,898,833.00
Project highlights
* Length of the bridge is 62 m.
* Carriageway of the bridge is 7.5 m with 1 m footpath on one side.
*Superstructure consists of RCC deck.
* Bridge comprises of 7 piers and 2 abutments.
* Length of approach roads is 93.50 m in the North and 63.00 m in the South with adequate lighting and proper drainage system.
Contractors
M/s. Aditya Construction Company
Consultants
M/s. Keni & D’Souza
See Similar Projects
Widening of road in Calangute – Baga.
View Project
Providing and applying high build, crack building, electromeric, protective and waterproof coating to the Grade separator (2 flyovers) at Dabolim airport.
View Project
Construction of Bridge at Dando Mollo in village panchayat Velsao-Pale in Cortalim constituency
View Project