Likely Date of Completion March 31 2024
Project highlights
Proposed Bridge is two lane (2 nos) with footpath on either side.
Bridge consists of 60m x 1 span(Tub girder composite steel concrete superstructure).
Foundation-Pile foundation of 1.2m dia & length 30m are proposed. Pile foundation will be in M40 concrete with 8mm liners. Pile caps will be supported on piles.
Substructure comprises of RCC plate piers, RCC pier cap with pier pedestals. Grade of concrete shall be M40. Length of Approache roads : Curchorem side – 106.25m
& Hodar Side – 90m
Contractors
Consultants