Project Duration
Stipulated Date of Commencement January 07 2022
Stipulated Date of Completion /
Likely Date of Completion
March 31 2024
Status
78%
Completed
Cost (₹)
Estimated at ₹ 176,805,244.00
Awarded for ₹ 189,521,822.60

Project highlights

Proposed Bridge is two lane (2 nos) with footpath on either side.
Bridge consists of 60m x 1 span(Tub girder composite steel concrete superstructure).
Foundation-Pile foundation of 1.2m dia & length 30m are proposed. Pile foundation will be in M40 concrete with 8mm liners. Pile caps will be supported on piles.
Substructure comprises of RCC plate piers, RCC pier cap with pier pedestals. Grade of concrete shall be M40. Length of Approache roads : Curchorem side – 106.25m
& Hodar Side – 90m

 
Contractors
M/s. K.V.J. Builders and Developers Pvt. Ltd.
Consultants
M/s. Madhav Kamat & Associates
 

See Similar Projects

Construction of Pedestrian Arch Bridge connecting Mandovi River Promenade and DB Road, over St. Inez Creek near ESG Building at Panaji

View Project

Construction of 6-lane Road Over Bridge (ROB) including approaches at Rawanfond, Margao

View Project

Construction of Bridge for local farmers to cross river stream for cultivation of fields from Chune – Kator to Vanso Field in Village of Cumbarjua.

View Project
x