Project Duration
Stipulated Date of Commencement December 22 2016
Stipulated Date of Completion /
Likely Date of Completion
March 21 2018
Status
100%
Completed
Cost (₹)
Estimated at ₹ 162,681,567.00
Awarded for ₹ 165,200,000.00

Project highlights

• Total plot area : 3270.00 Sq.m.
• Total Built-Up area : 5283.00Sq.m.
o Stilt Floor – 1,396.00Sq.m.
o First Floor – 1,335.00 Sq.m. (includes Account section, legal section ,Control room, Record room etc.)
o Second Floor – 1,335.00 Sq.m. (includes cabins for PCCF, APCCF, CCF , DCF, Conference room etc)
o Third Floor – 1,217.00 Sq.m. (includes cafe ,recreational room , future expansion area etc.)
• Parking
o 4 Wheelers – 50 Nos.
o 2 Wheelers – 48 No
• Landscape brought into building
• Transparency – glazing, bamboo facade
• Terrace gardens
The newly constructed Van Bhawan is located on the plot area of 3270.00 Sq.mts. at Altinho, Old IPHB complex – Goa. The building is designed as per standard building design codes with the key features Forest and Landscape. The total built up area is 3067.00 Sq. mts. with adequate space for PCCF, APCCF, CF, DCF, Account section, legal section, Library, conference rooms etc. The project also includes parking spaces for two wheelers (48 Nos.) and four wheelers (50 Nos).