Project Duration
Stipulated Date of Commencement November 16 2004
Actual Date of Completion November 30 2008
Status
100%
Completed
Cost (₹)
Estimated at ₹ 193,706,474.14
Awarded for ₹ 222,159,919.70

Project highlights

A 3-storeyed building with basement, ground + 2 floors with a plot area of 25,811 sq. m and built-up area of 19,310 sq. m. with a capacity of 230 beds
Main Building – Basement floor consists of car parking area for about 88 cars, waste disposal unit, AC plant, CSSD.- Another car parking area for 142 cars is around the main building. – Ground Floor consists of OPD clinics for gynaecologist / maternity, pediatrics, X-ray rooms, radiology department, ultra sound unit, 2 number of steel operation theaters and pharmacy, administrative section and conference room. First Floor consists of gymnasium, Accounts, ICU and ICCU, 8 steel operation theaters, etc. Second Floor consists of Wards and Blood Banks, etc. 4 hospital elevators, 2 passenger elevators, 2 service elevators
Ancillary Building (Service Block) – STP, mortuary, post-mortem, canteen, library, gas manifold, etc.
Building Management System and State-of-Art medical equipment’s (HVAC, elevators, fire fighting, external electrical work, medical gas pipelines, central sterile supply department, steel operation theater, mortuary cabinet, interior works, fire alarm & detection system and computerization), diagnostic equipment’s (imaging, pathology, medical diagnostic), minor surgical equipment’s, shadowless lamps & hydraulic tables for Operation Theater, kitchen equipment’s, hospital furniture including ambulance, geysers & incinerators, 33 KV cabling.

 
Contractors
M/s. Unity Infraprojects Limited
Consultants
M/s. Consulting Engineering Services Pvt. Ltd.
 

Sub Works

This project involved 25 sub works. The details of the same available below

1

Interior works

100% completed
 
Project Duration
Stipulated Date of Commencement June 30 2007
Stipulated Date of Completion /
Likely Date of Completion
November 30 2008
Status
100%
Completed
Cost (₹)
Estimated at ₹ 19,289,000.00
Awarded for ₹ 20,999,732.00

Project highlights

Furniture, false ceiling, partitions, signages, storage cabinets, workstations, modular furniture, etc.

 
Contractors
M/s. Damian de Goa
Consultants
M/s. Consulting Engineering Services Pvt. Ltd.
2

Supplying Installation Testing & Commissioning of 33 KV VCB Isolation at Substation for Electrical Supply.

100% completed
 
Project Duration
Stipulated Date of Commencement June 21 2008
Stipulated Date of Completion /
Likely Date of Completion
September 20 2008
Status
100%
Completed
Cost (₹)
Estimated at ₹ 1,783,101.00
Awarded for ₹ 1,872,218.00
 
Contractors
M/s. Ohm Engineers & Electricals Pvt. Ltd.
Consultants
M/s. Consulting Engineering Services Pvt. Ltd.
3

Supply Installation Testing & Commissioning of shadowless lamps, electro / mech hydraulic tables, etc. for Operation Theatre.

100% completed
 
Project Duration
Stipulated Date of Commencement April 26 2008
Stipulated Date of Completion /
Likely Date of Completion
October 30 2008
Status
100%
Completed
Cost (₹)
Estimated at ₹ 28,378,896.00
Awarded for ₹ 26,653,000.00
 
Contractors
M/s. Genuine Medica Pvt. Ltd.
Consultants
M/s. Consulting Engineering Services Pvt. Ltd.
4

Supply Installation Testing & Commissioning of Bio Medical Equipment (Part III) CT Scan.

100% completed
 
Project Duration
Stipulated Date of Commencement November 06 2008
Stipulated Date of Completion /
Likely Date of Completion
January 05 2009
Status
100%
Completed
Cost (₹)
Estimated at ₹ 2,57,50,000.00
Awarded for ₹ 2,43,34,000.00
 
Contractors
M/s. Wipro GE Healthcare
Consultants
M/s. Consulting Engineering Services Pvt. Ltd.
5

Supply Installation Testing & Commissioning of Bio Medical Equipment (Part II) Colour doppler & Ultra Sonography.

100% completed
 
Project Duration
Stipulated Date of Commencement November 06 2008
Stipulated Date of Completion /
Likely Date of Completion
February 17 2009
Status
100%
Completed
Cost (₹)
Estimated at ₹ 43,00,000.00
Awarded for ₹ 38,00,000.00
 
Contractors
M/s. Siemens Ltd.
Consultants
M/s. Consulting Engineering Services Pvt. Ltd.
6

Supply Installation Testing & Commissioning of water Heater & Purifier

100% completed
 
Project Duration
Stipulated Date of Commencement December 17 2008
Stipulated Date of Completion /
Likely Date of Completion
January 31 2009
Status
100%
Completed
Cost (₹)
Estimated at ₹ 263,660.00
Awarded for ₹ 392,000.00
 
Contractors
M/s. Oman Electricals
Consultants
M/s. Consulting Engineering Services Pvt. Ltd.
7

Supply, Installation, Testing & Commissioning of Medical Diagnostic.

100% completed
 
Project Duration
Stipulated Date of Commencement December 17 2008
Stipulated Date of Completion /
Likely Date of Completion
March 19 2009
Status
100%
Completed
Cost (₹)
Estimated at ₹ 12,15,500.00
Awarded for ₹ 1,210,124.00
 
Contractors
M/s. Medraid Systems
Consultants
M/s. Consulting Engineering Services Pvt. Ltd.
8

Supply Installation Testing & Commissioning of incinerators.

100% completed
 
Project Duration
Stipulated Date of Commencement January 15 2009
Stipulated Date of Completion /
Likely Date of Completion
March 14 2009
Status
100%
Completed
Cost (₹)
Estimated at ₹ 8,43,750.00
Awarded for ₹ 885,937.00
 
Contractors
M/s. Don Whitley Scientific Equipments Pvt. Ltd.
Consultants
M/s. Consulting Engineering Services Pvt. Ltd.
9

Supply, Installation, Testing and Commissioning of computer network with hardware and software.

100% completed
 
Project Duration
Stipulated Date of Commencement October 04 2007
Stipulated Date of Completion /
Likely Date of Completion
June 30 2009
Status
100%
Completed
Cost (₹)
Estimated at ₹ 8,314,729.00
Awarded for ₹ 8,015,705.00
 
Contractors
M/s. Paradyne Infotech Limited
Consultants
M/s. Consulting Engineering Services Pvt. Ltd.
10

Elevators.

100% completed
 
Project Duration
Stipulated Date of Commencement October 02 2006
Stipulated Date of Completion /
Likely Date of Completion
September 30 2008
Status
100%
Completed
Cost (₹)
Estimated at ₹ 14,654,000.00
Awarded for ₹ 13,017,000.00
 
Contractors
M/s. Thyssenkrupp Elevators India Pvt. Ltd.
Consultants
M/s. Consulting Engineering Services Pvt. Ltd.
11

Electrical works (External)

100% completed
 
Project Duration
Stipulated Date of Commencement October 15 2006
Stipulated Date of Completion /
Likely Date of Completion
September 30 2008
Status
100%
Completed
Cost (₹)
Estimated at ₹ 15,627,955.00
Awarded for ₹ 15,186,060.00
 
Contractors
M/s. Friends Engineering Corporation
Consultants
M/s. Consulting Engineering Services Pvt. Ltd.
12

Supplying and laying of 33 KV underground cable from Sub Station to District Hospital at Mapusa

100% completed
 
Project Duration
Stipulated Date of Commencement September 01 2007
Stipulated Date of Completion /
Likely Date of Completion
September 30 2008
Status
100%
Completed
Cost (₹)
Estimated at ₹ 15,221,765.00
Awarded for ₹ 16,545,265.00
 
Contractors
M/s. Goa Friends Engineering & Electricals Pvt. Ltd.
Consultants
M/s. Consulting Engineering Services Pvt. Ltd.
13

Air Conditioning and Ventilation System

100% completed
 
Project Duration
Stipulated Date of Commencement January 25 2007
Stipulated Date of Completion /
Likely Date of Completion
December 15 2008
Status
100%
Completed
Cost (₹)
Estimated at ₹ 29,518,019.00
Awarded for ₹ 31,090,000.00
 
Contractors
M/s. Vigneshwar Air Conditioning Pvt. Ltd.
Consultants
M/s. Consulting Engineering Services Pvt. Ltd.
14

Fire Fighting works.

100% completed
 
Project Duration
Stipulated Date of Commencement November 17 2006
Stipulated Date of Completion /
Likely Date of Completion
September 30 2008
Status
100%
Completed
Cost (₹)
Estimated at ₹ 8,027,620.00
Awarded for ₹ 7,385,712.00
 
Contractors
M/s. Japsin Jacob Wire Drawing Pvt. Ltd.
Consultants
M/s. Consulting Engineering Services Pvt. Ltd.
15

Bio medical equipment

100% completed
 
Status
100%
Completed
 
Consultants
M/s. Consulting Engineering Services Pvt. Ltd.
16

Steel Operation Theatre.

100% completed
 
Project Duration
Stipulated Date of Commencement March 26 2007
Stipulated Date of Completion /
Likely Date of Completion
September 30 2008
Status
100%
Completed
Cost (₹)
Estimated at ₹ 17,671,482.00
Awarded for ₹ 18,007,783.00
 
Contractors
M/s. MGI (I) Pvt. Ltd.
Consultants
M/s. Consulting Engineering Services Pvt. Ltd.
17

Mortuary Cabinet.

100% completed
 
Project Duration
Stipulated Date of Commencement March 26 2007
Stipulated Date of Completion /
Likely Date of Completion
October 05 2008
Status
100%
Completed
Cost (₹)
Estimated at ₹ 1,196,784.00
Awarded for ₹ 1,185,000.00
 
Contractors
M/s. Blue Star Ltd.
Consultants
M/s. Consulting Engineering Services Pvt. Ltd.
18

Medical gases & vacuum plant.

100% completed
 
Project Duration
Stipulated Date of Commencement March 26 2007
Stipulated Date of Completion /
Likely Date of Completion
September 30 2008
Status
100%
Completed
Cost (₹)
Estimated at ₹ 9,488,696.00
Awarded for ₹ 8,161,350.00
 
Contractors
M/s. MGI (I) Pvt. Ltd.
Consultants
M/s. Consulting Engineering Services Pvt. Ltd.
19

Central Sterile Supply Department.

100% completed
 
Project Duration
Stipulated Date of Commencement March 26 2007
Stipulated Date of Completion /
Likely Date of Completion
June 24 2008
Status
100%
Completed
Cost (₹)
Estimated at ₹ 8,548,209.00
Awarded for ₹ 9,552,600.00
 
Contractors
M/s. NAT Steel Equipment
Consultants
M/s. Consulting Engineering Services Pvt. Ltd.
20

Supply, installation, testing, commissioning of fire detection and alarm system

100% completed
 
Project Duration
Stipulated Date of Commencement October 04 2007
Stipulated Date of Completion /
Likely Date of Completion
September 30 2008
Status
100%
Completed
Cost (₹)
Estimated at ₹ 6,176,740.00
Awarded for ₹ 5,189,889.00
 
Contractors
M/s. Japsin Jacob Wire Drawing Pvt. Ltd.
Consultants
M/s. Consulting Engineering Services Pvt. Ltd.
21

Supply Installation Testing & Commissioning of Hospital Furniture.

100% completed
 
Project Duration
Stipulated Date of Commencement April 26 2008
Stipulated Date of Completion /
Likely Date of Completion
January 28 2009
Status
100%
Completed
Cost (₹)
Awarded for ₹ 11,258,858.00
 
Contractors
M/s. Royal Safe Company
Consultants
M/s. Consulting Engineering Services Pvt. Ltd.
22

Supply Installation Testing & Commissioning of Geysers & Water Purifiers.

100% completed
 
Project Duration
Stipulated Date of Commencement December 19 2008
Stipulated Date of Completion /
Likely Date of Completion
February 01 2009
Status
100%
Completed
Cost (₹)
Estimated at ₹ 263,660.00
Awarded for ₹ 392,000.00
 
Contractors
M/s. Oman Enterprises
Consultants
M/s. Consulting Engineering Services Pvt. Ltd.
23

Construction of soak pits.

100% completed
 
Project Duration
Stipulated Date of Commencement January 13 2009
Stipulated Date of Completion /
Likely Date of Completion
March 19 2009
Status
100%
Completed
Cost (₹)
Estimated at ₹ 360,532.00
Awarded for ₹ 378,460.00
 
Contractors
M/s. C. Abdullah
Consultants
Inhouse
24

Water Cooler.

100% completed
 
Project Duration
Stipulated Date of Completion /
Likely Date of Completion
November 21 2008
Status
100%
Completed
Cost (₹)
Awarded for ₹ 205,956.00
 
Contractors
M/s. Blue Star Ltd.
Consultants
Inhouse
25

Supply Installation Testing & Commissioning of Bio Medical Equipment ( Part I ) Mobile X-Ray, C-Arm, CR-System.

100% completed
 
Project Duration
Stipulated Date of Commencement August 18 2009
Stipulated Date of Completion /
Likely Date of Completion
January 19 2010
Status
100%
Completed
Cost (₹)
Estimated at ₹ 5,750,000.00
Awarded for ₹ 5,300,000.00
 
Contractors
M/s. Jindal Photo Ltd.
Consultants
M/s. Consulting Engineering Services Pvt. Ltd.

See Similar Projects

Construction of Yatri Niwas at GMC Complex, Bambolim, Goa-Civil, Plumbing & Internal Electrical works

View Project

Supply, Installation, Testing and Commissioning of Bronchoscope and Mediatinoscope

View Project

Fire Fighting, Fire Alarm & Public Address System

View Project
x