Status
100%
Completed

Project highlights

Science Faculty Building is conceptualized to meet the ever-growing needs of expansion of the campus to incorporate study of Science, for quality research facility and to create an excellent, modern research facility.
The work is completed in all respects at a cost of Rs. 48.00 Crore approximately and inaugurated on 13th May 2013.
The building is basement plus 2 storied RCC framed structure.
The built-up area is 20210.00 Sqm.
The structure is planned with three blocks AB block, C block and DE block, Where C block is joining of two wings AB and DE having main entrance at the Ground floor and Library and offices on upper floors. AB Block and DE block comprises lecture hall, research lab and administration spaces.
The building comprises of two seminar halls. One in AB block having capacity of 180 No chairs and other in DE block having capacity of 325 No chairs.
There are four central open courtyards for natural light and ventilation into the rooms.
The building has six staircase blocks designed for public circulation and one internal staircase in the library. All the staircases are well equipped for fire escape. Also 4 Nos. of lifts are provided.
Building is well equipped with fire fighting equipments, networking facilities, lab furniture, fume hoods in labs, gas piping in labs, interior & acoustic, furniture, etc.
All the floors are provided with adequate toilet facilities, etc.
Parking facilities for four wheelers and two wheelers, RCC road, landscaping, STP & ETP, Gas Bank, Pump room etc.

 
 

Additional Work

This project involved 15 additional tasks. The details of the same available below

Status Progress Project Duration
Start Date / End Date
Cost (Rs.)
Estimated / Awarded
Consultants & Contractors
1 Lifts / Elevator work.
100% completed
 
 

05/10/2009 - 30/04/2013

 

₹ 2,450,000.00 / ₹ 2,570,000.00

  M/s. Effective Architectural Services
- M/s. Thyssenkrupp Elevator (India) Pvt. Ltd.
2 Structural Steel, Roofing and Structural Glazing works
100% completed
 
 

14/08/2010 - 30/04/2012

 

₹ 17,300,928.00 / ₹ 16,920,811.16

  M/s. Effective Architectural Services
- M/s. D. S. Contractors Pvt. Ltd.
3 External Electrical work
100% completed
 
 

27/11/2010 - 20/08/2013

 

₹ 3,59,76,814.81 / ₹ 3,25,13,771.00

  M/s. Effective Architectural Services
- M/s. Rohini Industrial Electricals Ltd.
4 Fire Fighting Works
100% completed
 
 

20/01/2011 - 31/12/2013

 

₹ 10,548,704.00 / ₹ 11,883,785.00

  M/s. Effective Architectural Services
- M/s. Japsin Jacob Wire Drawing Pvt. Ltd..
5 False ceiling work.
100% completed
 
 

19/02/2011 - 30/09/2013

 

₹ 16,123,055.00 / ₹ 13,112,071.90

  M/s. Effective Architectural Services
- M/s. Concept Creator
6 Sewage & Effluent Treatment Plant
100% completed
 
 

22/06/2011 - 30/09/2013

 

₹ 3,648,277.41 / ₹ 3,589,980.00

  M/s. Effective Architectural Services
- M/s. Sombansi Enviro Engg. Pvt. Ltd.
7 Air conditioning work.
100% completed
 
 

02/04/2011 - 30/10/2013

 

₹ 28,636,345.00 / ₹ 22,999,999.00

  M/s. Effective Architectural Services
- M/s. Aprant Motors Pvt. Ltd.
8 Lab furniture work
100% completed
 
 

15/12/2011 - 30/06/2013

 

₹ 48,287,670.00 / ₹ 29,652,470.00

  M/s. Effective Architectural Services
- M/s. Godrej & Boyce Mfg. Co. Ltd.
9 Gas piping work.
100% completed
 
 

27/02/2012 - 30/09/2013

 

₹ 21,417,128.15 / ₹ 20,297,433.80

  M/s. Effective Architectural Services
- M/s. Steel Case
10 Fumehood, Blowers and Ducting work
100% completed
 
 

19/04/2012 - 30/09/2013

 

₹ 35,214,351.00 / ₹ 18,028,622.54

  M/s. Effective Architectural Services
- M/s. Steel Case
11 Networking work
100% completed
 
 

19/09/2012 - 06/09/2013

 

₹ 10,352,655.95 / ₹ 7,145,532.34

  M/s. Effective Architectural Services
- M/s. GMP Technology Solutions Pvt. Ltd
12 Interior & Acoustic Work
100% completed
 
 

17/12/2012 - 30/09/2013

 

₹ 31,641,360.00 / ₹ 31,593,913.87

  M/s. Effective Architectural Services
- M/s. T. S. Mistry
13 Lab Accessories work.
100% completed
 
 

13/01/2013 - 30/09/2013

 

₹ 1,67,16,761.10 / ₹ 1,64,23,070.00

  M/s. Effective Architectural Services
- M/s. Steel Case
14 Bio Incubator : Civil & Plumbing works.
100% completed
 
 

6/10/2012 - -

 

₹ 12,016,258.00 / ₹ 13,083,870.45

  M/s. Effective Architectural Services
- M/s. Indiana Build Infrastructure Pvt. Ltd.
15 Construction of Building for Science Faculty at Goa University, Taleigao, Tiswadi Goa – Civil, electrification & land development work.
100% completed
 
 

27/03/2007 - 30/09/2013

 

₹ 203,081,980.00 / ₹ 228,194,428.97

  M/s. Effective Architectural Services, M/s. Effective Architectural Services
- M/s. D. S. Contractors Pvt. Ltd., M/s. D. S. Contractors Pvt. Ltd.

See Similar Projects

Maintenance Works of Goa Medical College and Hospital & Goa Dental College S.H.: Supply, Installation, Testing & Commissioning of 2 Nos. 5.5TR ductable units for MRI section at Goa Medical College, Bambolim-Goa.

View Project

Interior Works for Office Premises for Departments / Corporations at EDC, Patto Plaza, Panaji, Goa

View Project

Construction of Washrooms at Old Goa for Exposition 2014 – Package II – Near Se Cathedral Church and St. Cajetan Church.

View Project
x