Project highlights
Science Faculty Building is conceptualized to meet the ever-growing needs of expansion of the campus to incorporate study of Science, for quality research facility and to create an excellent, modern research facility.
The work is completed in all respects at a cost of Rs. 48.00 Crore approximately and inaugurated on 13th May 2013.
The building is basement plus 2 storied RCC framed structure.
The built-up area is 20210.00 Sqm.
The structure is planned with three blocks AB block, C block and DE block, Where C block is joining of two wings AB and DE having main entrance at the Ground floor and Library and offices on upper floors. AB Block and DE block comprises lecture hall, research lab and administration spaces.
The building comprises of two seminar halls. One in AB block having capacity of 180 No chairs and other in DE block having capacity of 325 No chairs.
There are four central open courtyards for natural light and ventilation into the rooms.
The building has six staircase blocks designed for public circulation and one internal staircase in the library. All the staircases are well equipped for fire escape. Also 4 Nos. of lifts are provided.
Building is well equipped with fire fighting equipments, networking facilities, lab furniture, fume hoods in labs, gas piping in labs, interior & acoustic, furniture, etc.
All the floors are provided with adequate toilet facilities, etc.
Parking facilities for four wheelers and two wheelers, RCC road, landscaping, STP & ETP, Gas Bank, Pump room etc.
Sub Works
This project involved 15 sub works. The details of the same available below
Construction of Building for Science Faculty at Goa University, Taleigao, Tiswadi Goa – Civil, electrification & land development work.
Likely Date of Completion

Contractors

Consultants
Lifts / Elevator work.
Likely Date of Completion

Contractors

Consultants
Structural Steel, Roofing and Structural Glazing works
Likely Date of Completion

Contractors

Consultants
External Electrical work
Likely Date of Completion

Contractors

Consultants
Fire Fighting Works
Likely Date of Completion

Contractors

Consultants
False ceiling work.
Likely Date of Completion

Contractors

Consultants
Sewage & Effluent Treatment Plant
Likely Date of Completion

Contractors

Consultants
Air conditioning work.
Likely Date of Completion

Contractors

Consultants
Lab furniture work
Likely Date of Completion

Contractors

Consultants
Gas piping work.
Likely Date of Completion

Contractors

Consultants
Fumehood, Blowers and Ducting work
Likely Date of Completion

Contractors

Consultants
Networking work
Likely Date of Completion

Contractors

Consultants
Interior & Acoustic Work
Likely Date of Completion

Contractors

Consultants
Lab Accessories work.
Likely Date of Completion

Contractors

Consultants
Bio Incubator : Civil & Plumbing works.
Likely Date of Completion

Contractors

Consultants

See Similar Projects

Repairs & Upgradation of Government Schools in the State of Goa: GHS –Mangoor Hill
View Project
Strengthening of existing food and drugs laboratory under Directorate of Food & Drugs Administration Block at Bambolim Complex, Bambolim,Tiswadi,Goa SH-Upgradation of the microbiological Drugs section.
View Project
External Development Work
View Project