Project highlights
Science Faculty Building is conceptualized to meet the ever-growing needs of expansion of the campus to incorporate study of Science, for quality research facility and to create an excellent, modern research facility.
The work is completed in all respects at a cost of Rs. 48.00 Crore approximately and inaugurated on 13th May 2013.
The building is basement plus 2 storied RCC framed structure.
The built-up area is 20210.00 Sqm.
The structure is planned with three blocks AB block, C block and DE block, Where C block is joining of two wings AB and DE having main entrance at the Ground floor and Library and offices on upper floors. AB Block and DE block comprises lecture hall, research lab and administration spaces.
The building comprises of two seminar halls. One in AB block having capacity of 180 No chairs and other in DE block having capacity of 325 No chairs.
There are four central open courtyards for natural light and ventilation into the rooms.
The building has six staircase blocks designed for public circulation and one internal staircase in the library. All the staircases are well equipped for fire escape. Also 4 Nos. of lifts are provided.
Building is well equipped with fire fighting equipments, networking facilities, lab furniture, fume hoods in labs, gas piping in labs, interior & acoustic, furniture, etc.
All the floors are provided with adequate toilet facilities, etc.
Parking facilities for four wheelers and two wheelers, RCC road, landscaping, STP & ETP, Gas Bank, Pump room etc.
Additional Work
This project involved 15 additional tasks. The details of the same available below
Status | Progress | Project Duration Start Date / End Date |
Cost (Rs.) Estimated / Awarded |
Consultants & Contractors | ||
---|---|---|---|---|---|---|
|
||||||
100% completed
|
5/10/2009 - 30/4/2013 |
₹ 2,450,000.00 / ₹ 2,570,000.00 |
M/s. Effective Architectural Services
- M/s. Thyssenkrupp Elevator (India) Pvt. Ltd. |
|||
|
||||||
100% completed
|
14/8/2010 - 30/4/2012 |
₹ 17,300,928.00 / ₹ 16,920,811.16 |
M/s. Effective Architectural Services
- M/s. D. S. Contractors Pvt. Ltd. |
|||
|
||||||
100% completed
|
27/11/2010 - 20/8/2013 |
₹ 3,59,76,814.81 / ₹ 3,25,13,771.00 |
M/s. Effective Architectural Services
- M/s. Rohini Industrial Electricals Ltd. |
|||
|
||||||
100% completed
|
20/1/2011 - 31/12/2013 |
₹ 10,548,704.00 / ₹ 11,883,785.00 |
M/s. Effective Architectural Services
- M/s. Japsin Jacob Wire Drawing Pvt. Ltd.. |
|||
|
||||||
100% completed
|
19/2/2011 - 30/9/2013 |
₹ 16,123,055.00 / ₹ 13,112,071.90 |
M/s. Effective Architectural Services
- M/s. Concept Creator |
|||
|
||||||
100% completed
|
22/6/2011 - 30/9/2013 |
₹ 3,648,277.41 / ₹ 3,589,980.00 |
M/s. Effective Architectural Services
- M/s. Sombansi Enviro Engg. Pvt. Ltd. |
|||
|
||||||
100% completed
|
2/4/2011 - 30/10/2013 |
₹ 28,636,345.00 / ₹ 22,999,999.00 |
M/s. Effective Architectural Services
- M/s. Aprant Motors Pvt. Ltd. |
|||
|
||||||
100% completed
|
15/12/2011 - 30/6/2013 |
₹ 48,287,670.00 / ₹ 29,652,470.00 |
M/s. Effective Architectural Services
- M/s. Godrej & Boyce Mfg. Co. Ltd. |
|||
|
||||||
100% completed
|
27/2/2012 - 30/9/2013 |
₹ 21,417,128.15 / ₹ 20,297,433.80 |
M/s. Effective Architectural Services
- M/s. Steel Case |
|||
|
||||||
100% completed
|
19/4/2012 - 30/9/2013 |
₹ 35,214,351.00 / ₹ 18,028,622.54 |
M/s. Effective Architectural Services
- M/s. Steel Case |
|||
|
||||||
100% completed
|
19/9/2012 - 6/9/2013 |
₹ 10,352,655.95 / ₹ 7,145,532.34 |
M/s. Effective Architectural Services
- M/s. GMP Technology Solutions Pvt. Ltd |
|||
|
||||||
100% completed
|
17/12/2012 - 30/9/2013 |
₹ 31,641,360.00 / ₹ 31,593,913.87 |
M/s. Effective Architectural Services
- M/s. T. S. Mistry |
|||
|
||||||
100% completed
|
13/1/2013 - 30/9/2013 |
₹ 1,67,16,761.10 / ₹ 1,64,23,070.00 |
M/s. Effective Architectural Services
- M/s. Steel Case |
|||
|
||||||
100% completed
|
6/10/2012 - - |
₹ 12,016,258.00 / ₹ 13,083,870.45 |
M/s. Effective Architectural Services
- M/s. Indiana Build Infrastructure Pvt. Ltd. |
|||
|
||||||
100% completed
|
27/3/2007 - 30/9/2013 |
₹ 203,081,980.00 / ₹ 228,194,428.97 |
M/s. Effective Architectural Services, M/s. Effective Architectural Services, M/s. Effective Architectural Services
- M/s. D. S. Contractors Pvt. Ltd., M/s. D. S. Contractors Pvt. Ltd., M/s. D. S. Contractors Pvt. Ltd. |
|||

See Similar Projects

Repairs of roofing works of old Primary Health Centre at Sanquelim, Goa.
View Project
Extension / Upgradation of Government College of Arts, Science & Commerce at Khandola, Marcel, Goa
View Project
Full Renovation And Part Construction Of The Old Heritage Building Of Asilo Hospital For State Health Training Institute At Mapusa. SH-External Lighting Work
View Project