प्रकल्प कालावधी
सुरू होण्याची ठराविक तारीख
January 2 2016
पूर्ण होण्याची वास्तविक तारीख
June 30 2022
स्थिती
100%
पूर्ण झालेले
किंमत (₹)
अंदाजे खर्च
₹ 151141272.59
ला देण्यात आला
₹ 157912311.00
प्रकल्पाची अंतिम किंमत
₹ 107022086.00
प्रकल्पाची ठळक वैशिष्ट्ये
The work of Promenade was executed from Youth Hostel to Kala Academy having 900 meter length with 4.5 m wide walkway & 2.5 m cycle track. Rip rap was provided to protect the coast. Selfie points & senior citizen park was renovated.

कंत्राटदार
M/s. Krishna Builder

सल्लागार
M/s. LKS India Pvt Ltd.