प्रकल्पाची कालावधी
सुरवात जावपाची थारायल्ली तारीख
January 2 2016
पुराय जावपाची प्रत्यक्ष तारीख
June 30 2022
स्थिती
100%
पुराय जाल्ले
खर्च (₹)
अदमास खर्च
₹ 151141272.59
दिले
₹ 157912311.00
प्रकल्पाचो निमाणो खर्च
₹ 107022086.00
प्रकल्प हायलायट्स
The work of Promenade was executed from Youth Hostel to Kala Academy having 900 meter length with 4.5 m wide walkway & 2.5 m cycle track. Rip rap was provided to protect the coast. Selfie points & senior citizen park was renovated.
कंत्राटदार
M/s. Krishna Builder
सल्लागार
M/s. LKS India Pvt Ltd.