Likely Date of Completion May 31 2015
Project highlights
• The building has been provided with easy to maintain, clean and hygienic infrastructure.
• Clear segregation of various age groups.
• Total strengthening of existing structure and existing RCC scattered roofs covered with large single fourway galvalume sheet roofing, having large overhangs. The large roof helps protect the building against Rains and harsh sunlight.
• The walls are clad internally with vitrified tiles. These help in easy maintenance and to prevent any vandalisation of wall surfaces. The tile cladding also helps to strengthen the week walls.
• Playful and colourful interiors.
• All dormitories provided with attached toilets.
• Separate kitchen and dining facilities for Girls.
• CCTV surveillance of common areas and speaker systems installed throughout the building for Music.
• Easy access to the secured, outdoors and garden for inmates.
• Ample natural light and ventilation.
• Windows provided with toughened glass. Doors are designed to be porous to keep easy watch on the inmates.
Contractors
Consultants
See Similar Projects
Construction of building at Patto with provision for Gas Insulated Sub Station, Panaji, Goa Phase I – Electrical Works
View Project
Construction of houses for Tariwada landslide victims at Headland Sada, Vasco.
View Project
Refurbishment of Maquinex Palace Annexe and heritage building – Interior works of ESG.
View Project





