Likely Date of Completion May 26 2015
Project highlights
The jetty is a T-shaped fixed piled concrete jetty, with two concrete floating pontoons and permanent piled concrete berthing dolphins. The T-shaped fixed piled concrete jetty provides access to the two concrete floating pontoons which weighs 180 tons each and which are in turn berthing dolphins that ensure the concrete floating pontoon move only along the Z-axis by means of system of stainless steel yokes.