Likely Date of Completion November 21 2004
Project highlights
• Length : 150 m, width : 12 m.
• Length of clear navigational span : 65 m.
• Carriage way width: 7.5 m.
• Width of footpaths with paver block : 1.50 m.
• Length of approach on Pirna side : 200 m and on Ozorim side : 450 m.
• Electric poles with fixtures on the bridge and approaches.
• The bridge serves as a connection to the Ozorim and Pirna village.
• The bridge has reduced the distance from Pirna to Pernem by 15 kms