प्रकल्पाची कालावधी
सुरवात जावपाची थारायल्ली तारीख
July 27 2014
पुराय जावपाची प्रत्यक्ष तारीख
January 09 2024
स्थिती
100%
पुराय जाल्ले
खर्च (₹)
अदमास खर्च
₹ 3,550,000,000.00
दिले
₹ 4,030,000,000.00
प्रकल्प हायलायट्स
Bridge connecting Panaji and Porvorim of total lenght 5.44 km with cable stayed portion in the river spanning to 620m..
कंत्राटदार
M/s. Larsen & Toubro Limited
सल्लागार
M/s. TPF Engineering Pvt. Ltd.