Likely Date of Completion December 14 2024
Project highlights
Proposed building consists of a ground + 2 RCC framed structure
It has provision for three classrooms with toilet facilities.
Total built up area of the project is 200 sq.m.
The building shall be constructed after demolishing an old structure to the left of the existing temple and by excavating the raised ground to the level of the temple precinct.
The building shall have vitrified flooring and Galvalume sheets sloping roof.