Likely Date of Completion May 31 2015
Project highlights
• The building has been provided with easy to maintain, clean and hygienic infrastructure.
• Clear segregation of various age groups.
• Total strengthening of existing structure and existing RCC scattered roofs covered with large single fourway galvalume sheet roofing, having large overhangs. The large roof helps protect the building against Rains and harsh sunlight.
• The walls are clad internally with vitrified tiles. These help in easy maintenance and to prevent any vandalisation of wall surfaces. The tile cladding also helps to strengthen the week walls.
• Playful and colourful interiors.
• All dormitories provided with attached toilets.
• Separate kitchen and dining facilities for Girls.
• CCTV surveillance of common areas and speaker systems installed throughout the building for Music.
• Easy access to the secured, outdoors and garden for inmates.
• Ample natural light and ventilation.
• Windows provided with toughened glass. Doors are designed to be porous to keep easy watch on the inmates.
Contractors
Consultants
See Similar Projects
Improvement of Shree Navadurga Temple premises by laying interlocking paver blocks at Deulwada, Pale in V.P. Pale Cottombi in Sankhali Constituency
View Project
Renovation/alteration of DIET Building for Goa Human Resource Development Corporation at Porvorim, Goa
View Project
Interior work for TCP branch office, Tiswadi Branch, 5th Floor, Kamat Towers
View Project





