Likely Date of Completion May 31 2015
Project highlights
• The building has been provided with easy to maintain, clean and hygienic infrastructure.
• Clear segregation of various age groups.
• Total strengthening of existing structure and existing RCC scattered roofs covered with large single fourway galvalume sheet roofing, having large overhangs. The large roof helps protect the building against Rains and harsh sunlight.
• The walls are clad internally with vitrified tiles. These help in easy maintenance and to prevent any vandalisation of wall surfaces. The tile cladding also helps to strengthen the week walls.
• Playful and colourful interiors.
• All dormitories provided with attached toilets.
• Separate kitchen and dining facilities for Girls.
• CCTV surveillance of common areas and speaker systems installed throughout the building for Music.
• Easy access to the secured, outdoors and garden for inmates.
• Ample natural light and ventilation.
• Windows provided with toughened glass. Doors are designed to be porous to keep easy watch on the inmates.
Contractors
Consultants
See Similar Projects
Raising the Existing Compound Wall and Providing Additional Gutters
View Project
Upgradation of RMU
View Project
Refurbishment of Maquinez Palace, Maquinez Palace Annexe, Heritage Building (ESG), Panaji, Goa – Civil, Plumbing & Electrical works.
View Project





