Project Duration
Stipulated Date of Commencement
January 07 2022
Stipulated Date of Completion /
Likely Date of Completion July 15 2024
Likely Date of Completion July 15 2024
Status
99%
Completed
Cost (₹)
Estimated at
₹ 176,805,244.00
Awarded for
₹ 189,521,822.60
Project highlights
Proposed Bridge is two lane (2 nos) with footpath on either side. Bridge consists of 60m x 1 span(Tub girder composite steel concrete superstructure). Foundation-Pile foundation of 1.2m dia & length 30m are proposed. Pile foundation will be in M40 concrete with 8mm liners. Pile caps will be supported on piles. Substructure comprises of RCC plate piers, RCC pier cap with pier pedestals. Grade of concrete shall be M40. Length of Approache roads : Curchorem side – 106.25m & Hodar Side – 90m
Contractors
M/s. K.V.J. Builders and Developers Pvt. Ltd.
Consultants
M/s. Madhav Kamat & Associates
See Similar Projects
Re-development of KTC Bus Stand at Bicholim, Goa
View Details
Construction of four lane bridge at Sanguem Town.
View Details
Design and construction of bridge connecting Keri to Tiracol
View Details