Likely Date of Completion September 30 2024
Project highlights
The project consist of football ground,Lap pool (Size 50 x 22m),Diving pool (Size 23 x 18.2m) with Diving board structure,Warm up pool (Size 25 x 15m),Main Building consisting of Double Height entrance lobby with reception and seating arrangement, 3 Nos. Badminton courts, 3Nos. table tennis courts,2Nos. Squash court,2 Nos. Billiards Table,Gymnasium,Indoor games room,Reading room, Multipurpose Hall etc
Contractors
Consultants
Sub Works
This project involved 2 sub works. The details of the same available below
Construction Of Multipurpose Hall Having Badminton Court, Gymnasium, Changing Room and Other Facilities at Socorro Ground. – Mechanical, Electrical, Plumbing scope of work pertaining to Lap Pool, Diving Pool and Baby Pool.
Likely Date of Completion September 30 2024
Project highlights
Mechanical, Electrical, Plumbing Scope of Work Pertaining to all pools
Contractors
Consultants
Construction Of Multipurpose Hall Having Badminton Court, Gymnasium, Changing Room and Other Facilities at Socorro Ground. – Interior Works.
Likely Date of Completion September 30 2024
Project highlights
Interior Works
Contractors
Consultants
See Similar Projects
Construction of New Lecture Hall (1, 2 &3) at Goa Medical College and Hospital at Bambolim, Goa– Civil, Plumbing, Electrical, Lifts, HVAC and Firefighting works.
View Details
Construction of Ashram school under centrally sponsored scheme of Ministry of Tribal Affairs at “MOSHIPHOND” in the Land under Survey no. 20/0 in the Village Poinguinim of Canacona Taluka – Balance RMU Works & Shed work for existing 11 KV 315 KVA Transformer Substation.
View Details
Development work of Integrated Education complex at Cujira, Bambolim, Tiswadi, Goa
View Details