Project Duration
Stipulated Date of Commencement
January 14 2021
Actual Date of Completion
February 08 2022
Status
100%
Completed
Cost (₹)
Estimated at
₹ 3,161,784.00
Awarded for
₹ 3,463,206.00
Project highlights
Repair works
Contractors
M/S. Race Constructions
Consultants
M/s. Rahul Deshpande and Associates
Sub Works
This project involved 1 sub works. The details of the same available below
1
Repairs & Upgradation of Solid Waste Management Facilities within the Jurisdiction of CCP in Panaji City – Electrical Works.
100% Completed
Project Duration
Stipulated Date of Commencement
June 20 2021
Actual Date of Completion
February 28 2023
Status
100%
Completed
Cost (₹)
Estimated at
₹ 11,658,751.00
Awarded for
₹ 11,264,964.00
Project highlights
Electrical wiring, SITC of electrical substation at three existing sheds
1) Organic waste management facility behind Heera petrol pump patto.
2) Waste Management facility opposite LIC building at Patto.
3) Material recovery facility at St. Inez in panaji.
Contractors
M/s. Girish Enterprises Pvt. Ltd.
Consultants
M/s. Rahul Deshpande & Associates
See Similar Projects
Fire suppression system.
View Details
Refurbishment of Maquinex Palace Annexe and heritage building – Interior works of ESG.
View Details
Strengthening of existing food and drugs laboratory under Directorate of Food & Drugs Administration Block at Bambolim Complex, Bambolim,Tiswadi,Goa SH-Upgradation of the Microbiological Drugs section.
View Details