Project Duration
Stipulated Date of Commencement
February 26 2014
Actual Date of Completion
Status
100%
Completed
Cost (₹)
Estimated at
₹ 15,67,33,007.00
Awarded for
₹ 17,84,08,183.39
Project highlights
The jetty is a T-shaped fixed piled concrete jetty, with two concrete floating pontoons and permanent piled concrete berthing dolphins. The T-shaped fixed piled concrete jetty provides access to the two concrete floating pontoons which weighs 180 tons each and which are in turn berthing dolphins that ensure the concrete floating pontoon move only along the Z-axis by means of system of stainless steel yokes.
Contractors
M/s. M. Venkata Rao Infra Projects Pvt. Ltd.
Consultants
M/s. Kashec Engineers Pvt. Ltd.
See Similar Projects
Improvement and Upgradation of the existing MDR from Dandevaddo to Chandor via Sarzora and Guddi in Cuncolim Constituency.
View Details
Phase I : Land Development.
View Details
Improvement and Widening to four lane road from km.34/200 to km.35/600 at Navelim including construction of pavement at various places.
View Details