Project Duration
Stipulated Date of Commencement May 22 2003
Actual Date of Completion May 08 2006
Status
100%
Completed
Cost (₹)
Estimated at ₹ 91,123,000.00
Awarded for ₹ 87,900,000.00

Project highlights

• Length : 150 m, width : 12 m.
• Length of clear navigational span : 65 m.
• Carriage way width: 7.5 m.
• Width of footpaths with paver block : 1.50 m.
• Length of approach on Pirna side : 200 m and on Ozorim side : 450 m.
• Electric poles with fixtures on the bridge and approaches.
• The bridge serves as a connection to the Ozorim and Pirna village.
• The bridge has reduced the distance from Pirna to Pernem by 15 kms

 
Gallery Image
Contractors
M/s. M. Venkata Rao Infra Projects Pvt. Ltd.
Gallery Image
Consultants
M/s. TPF Engineering Pvt. Ltd.
 
Similar Projects

See Similar Projects

Similar Project

Electrification of New Link Road from Gaundali To Khandola

View Details
Similar Project

Laying of paver blocks on Promenade/ Footpath along D. B. Marg in Panaji.

View Details
Similar Project

Construction of Bridge at Mungul.

View Details
x
  • 150yrs of Celebrating Mahatma Gandhi
  • Digital India
  • Government Of Goa
  • Incredible India
  • NationalPortal India gov
Disclaimer: Translated by Directorate of Official Language, Government of Goa. Note: In any case for legal interpretation, English version will prevail.