Project Duration
Stipulated Date of Commencement
May 22 2003
Actual Date of Completion
May 08 2006
Status
100%
Completed
Cost (₹)
Estimated at
₹ 91,123,000.00
Awarded for
₹ 87,900,000.00
Project highlights
• Length : 150 m, width : 12 m.
• Length of clear navigational span : 65 m.
• Carriage way width: 7.5 m.
• Width of footpaths with paver block : 1.50 m.
• Length of approach on Pirna side : 200 m and on Ozorim side : 450 m.
• Electric poles with fixtures on the bridge and approaches.
• The bridge serves as a connection to the Ozorim and Pirna village.
• The bridge has reduced the distance from Pirna to Pernem by 15 kms
Contractors
M/s. M. Venkata Rao Infra Projects Pvt. Ltd.
Consultants
M/s. TPF Engineering Pvt. Ltd.
See Similar Projects
Acoustic work for Multipurpose Hall.
View Details
Beautifcation of road from Sanvordem circle to Capxem.
View Details
Construction of Bus Stand and Shopping Complex at Assonora, Bardez, Goa – Electrical works.
View Details