Likely Date of Completion August 31 2024
Project highlights
Project consists– The Lower Ground floor caters completely to the 24×7 emergency services.This consists of the main Parking bay which is equipped to hold 2 water tenders and one emergency rescue tender and office units.
An ambulance and motorcycle response unit for emergency response, Upper Ground Floor – This consists of the main office block housing a capacity of 22 personnel,
public entrance with reception area housing a capacity of 10 people,
Gym housing a capacity of 10 people, First Floor – The training room housing a capacity of 46 people. 2 rest rooms for the office block single units.The male dormitory housing 26 people and Second Floor – This floor consists of the female dormitory housing 10 people and its units
Contractors
Consultants
Sub Works
This project involved 1 sub works. The details of the same available below
Construction of Modern Fire Station at Valpoi, Goa – Interior works.
Likely Date of Completion August 31 2024
Project highlights
It includes loose furniture, carpentary furniture, false ceiling, ACP Cladding etc
Contractors
Consultants
See Similar Projects
Development of Freedom Fighters Memorial at Patradevi and Areas surrounding the Memorial – Phase I.
View Project
Maintenance works at Goa Medical College and Hospital S.H.: Maintenance Contract for the OTIS make 15 passenger cum bed lift installed at TB and Chest Diseases Hospital, St. Inez Goa for a period of three years (2020-2023).
View Project
Repairs/ Maintenance of Buildings under Directorate of Food and Drugs Administration, Bambolim – Goa. S.H. –Maintenance Contract for the 180kVA Diesel Generator set installed at Directorate of Food and Drugs Administration, Bambolim for three years (2021-2024)
View Project