Likely Date of Completion March 25 2017
Project highlights
• Walking track/Pathway- The Park has a 230 m long pathway as walking track finished with Polygon Beauty paver block.
• Stage- It is provided with a stage of area 27.40 Sq.m, finished with Kota stone flooring and covered with colour coated galvulium roofing sheets.
• Pergola- It is provided with pergola finished with colour concrete flooring.
• Badminton Court- The flooring of the existing badminton court is finished with colour concrete and Flag Stone Paver block for surrounding area.
• Play Area- the Park is equipped with 1 set of multipurpose play system, G.I Arch Double Swing and 1set Kid’s Multiple Set play system. All the play system are installed on EPDM rubber flooring and inter connected with pathway finished with Grass Paver block.
• Landscape- It is covered with Crab Grass and planted with different types of plants such as Golden Duranta, Canna Pink1′ high, Almanda yellow, Wedelia Tilobata and Palms like Coconut Palm, Champion Palm, Areca Palm.
• Electrical- It is well lighted with Decorative Luminaries mounted on decorative bracket on 4 m height G.I poles and decorative integral bollards
Contractors
Consultants





