Likely Date of Completion April 30 2021
Project highlights
Main Building
Basement:
• CSO (Central Stores office) & Pharmacy store
• Laundry, Stores &maintenance workshops & Parking space
Ground Floor:
• 21 OPD Clinics, Casualty with minor Operation Theatre,
• Diagnostics, Imaging suite, Physiotherapy, Blood Bank, Laboratory
• CSSD (Central Supply Stores Department), IPD Kitchen etc.
First Floor:
• 7 Operation Theatres with Pre & Post-Operative Room, Surgery, ENT IPD ward, Burns ward, Prisoners’ ward etc.
Second Floor:
• Administrative block, 3 OT, Obstetrics & Gynecology and Pediatric IPD wards, NICU (Neonatal Intensive Care Unit), PICU (Pediatric Intensive Care Unit)
Third Floor:
• MICU, ICU, Dialysis, Psychiatry, Medicine, IPD wards
Mortuary Building
• Morgue for 72 cabinets, Autopsy Room, Embalming Room, Waiting, Doctors Rooms, Post Mortem Room etc.
Utility Building
• Transformers, Electrical panel room Chiller system, Water Filtration system, Hot water tanks
• Underground water tanks for raw water, domestic water, soft water and fire water.
• D. G. sets outside
Contractors
Consultants
Sub Works
This project involved 11 sub works. The details of the same available below
False ceiling work.
Likely Date of Completion April 15 2021
Project highlights
Metal False Ceiling, Calcium silicate false ceiling work
Contractors
Consultants
Interior work
Likely Date of Completion June 15 2023
Project highlights
Modular, carpentry & miscellaneous furniture
Contractors
Consultants
Sewage Treatment Plant
Likely Date of Completion April 30 2021
Project highlights
0.4 MLD STP & RO Plant
Contractors
Consultants
Supply, Installation, Testing & Commissioning of Central Sterile Supply Department (CSSD) equipments
Likely Date of Completion May 11 2019
Project highlights
The Project consist of supply and installation of variour Central sterile service equipments and furniture etc
Contractors
Consultants
SITC of medical gas supply system (MGSS)
Likely Date of Completion August 31 2019
Project highlights
The project consist of supply and erection of new medical gas line distribution system such as Oxygen Manifold system, Air compressors, Vaccumm Plant etc
Contractors
Consultants
Rear Side parking and Biomedical Waste Building
Likely Date of Completion December 14 2022
Project highlights
Development of parking space
Contractors
Consultants
Supply & Installation of Lead Doors & Lead Glass
Likely Date of Completion September 07 2020
Project highlights
Supply and installation of lead doors
Contractors
Consultants
Supply, Installation, Testing and Commissioning of Token System
Likely Date of Completion December 01 2019
Contractors
Consultants
Supply, installation, testing and commissioning of 2 nos. of 30 KVA UPS
Likely Date of Completion July 27 2020
Contractors
Consultants
Steel Operation Theatre
Likely Date of Completion February 18 2019
Contractors
Consultants
Construction of 500 Bedded District Hospital At Margao, Goa – LV System
Likely Date of Completion March 31 2024
Project highlights
The work consists of Nurse Call system, telephone system, UPS, Building Management System, LAN, CCTV, etc.
Contractors
Consultants
See Similar Projects
Construction of IInd phase at Goa Dental College and Hospital at Bambolilm, Goa -Civil,Plumbing, internal electrical and fire fighting works-
View Project
Remodelling of existing Sewage Treatment Plant for GMC, Bambolim, Goa (C-Tech).
View Project
Supply, Installation, Testing and Commissioning of Cautery Machine
View Project