Likely Date of Completion November 18 2014
Project highlights
* Total plot area is 3500m2.
* Built-up area is 636.37 m2.
* 4 Classrooms of 40 students having an area of 60m2 each and has future provision of first floor (additional four classrooms). Toilets for boys & girls are separately provided.
* All modern amenities required for the growth of education standards like Computer data & Telephone networking, Mirror Optic fittings, fans, etc. are provided.
* Moving out of the classroom Concept is adopted which helps in extending the learning environment.
* BREAK OUT SPACE or COLLABORATION AREA or COURT YARD of area 130m2 is provided adjoining the Classrooms. This space is utilized for DISCUSSIONS or GUIDANCE, which helps Cross disciplinary learning and Project/research based learning. “APPLIED” learning is encouraged.
* Balwadi of area 52m2 with provision of a kitchen of area 13m2 and a store area of 8m2. Balwadi also has a separate toilet, which makes the balwadi a full fledged unit attached to the school premises.
* The class room has RCC Slab and the whole structure is covered with double skinned insulated galvalume sheets for better insulation & ventilation.
* CCTV security is provided for the school.
* 5 writing boards & argonomically designed benches with chairs are provided.
Contractors
Consultants
See Similar Projects
Repairs/Upgradation & Maintenance of Government schools in the State of Goa – Quepem Taluka – Package F.
View Project
Repairs/Upgradation of Government High School at Vadenagar,Vasco, Goa.
View Project
Re-civil, plumbing and electical works- Salcete Taluka-Package A (GPS Ghantomorad, GPS Davorlim Maruti Mandir, GPS Seraulim, GPS Telaulim).
View Project





