|
7. |
Present Status |
: |
Drawings are issued to the agency. Material / equipment details of D.G. Set, Transformer, Load brake switch, HT metering, Kiosks, etc., are approved. Foundation work of Transformer, D.G. Set is in progress. Transformer and D.G. Set are inspected and being delivered at site. |